What is the key reason for deploying each team increment to the production-equivalent staging environment?
- A . Teams can verify whether new functionality or Nonfunctional Requirements are compatible with the current production configuration.
- B . It allows the System Team to test the deployability of the Solution.
- C . It enable SAFe teams to Develop on Cadence and Release Any Time.
- D . If something goes wrong with the production environment, teams can switch their staging to perform the role of production.
What activity calls for using ROAM technique?
- A . Refining the Program Backlog.
- B . Managing the ART sync.
- C . Categorizing program risks during PI Planning.
- D . Managing teams by the Release Train Engineer.
What activity does NOT happen on Day 1 of PI Planning? (Select 2)
- A . ROAMing of risks.
- B . Assignment of business value.
- C . Management review and problem-solving meeting.
- D . Team breakouts.
- E . Hourly checkpoints.
Developing a framework for decision-making is tool for taking an economic view.
- A . True
- B . False
What steps in the Portfolio Kanban are most appropriate for running research spikes? (Select 2)
- A . Analysis-spikes help clarify feasibility.
- B . Implementing-teams perform spikes as usual
- C . Funnel-understand whether the Epic makes sense.
- D . Portfolio Backlog-run a spike before pulling into development.
What are the ways to evolve the Solution Intent from variable to fixed scope? (Select 2)
- A . Creating work breakdown structures.
- B . Modeling
- C . Adapting WIP limits
- D . Building prototypes
A Scrum Master asked you to help her use systems thinking to identify the backlog items that would improve the system as a whole. Select one item that uses systems thinking most effectively.
- A . Involve representatives of department teams in Iteration Planning and Demos.
- B . Make daily stand-ups more engaging and strictly timeboxed.
- C . Review the burn-down chart at each retrospective to improve team estimating.
- D . Increase unit test coverage.
(Select 2) What are the responsibilities of a Business Owner?
- A . Assign business value to Team Objectives during PI Planning.
- B . Participate in Post-PI Planning and assist trains in adjusting ART PI plans as needed.
- C . Assign business value to Epics and Features.
- D . Ensure that the Solution Demo occurs.
- E . Determine the product Roadmap
How do you demo a spike? (Select 3)
- A . Spikes are strictly for internal learning of the team and do not need to be demoed.
- B . Showing the functioning code in the production environment.
- C . Showing the knowledge gained by the spike.
- D . Showing a prototype produced for the spike.
- E . Showing the quantitative data that will prove useful in developing future user stories.
What are the 2 biggest reasons to reduce batch size? (Select 2)
- A . Make it easier to assess the state of smaller batches.
- B . Decrease stress on the system.
- C . Increase throughput.
- D . Produce less measurement overhead.