Practice Free MB-335 Exam Online Questions
HOTSPOT –
Case Study
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
Fabrikam Inc. is a manufacturer of sanitation cleaning solutions and equipment including carpet/floor cleaners, pressure washers, scrubbers and vacuums.
Fabrikam Inc. is a single legal entity based in New York city.
_ Current environment
Products manufactured
• Cleaning equipment o floor cleaner
o pressure washers o scrubbers
o vacuums
• Liquid cleaning solutions o No scent
o Orange scent (subcontracted to a vendor named Vendor A)
o Pine scent (subcontracted to a vendor named Vendor A)
The production quantity for the finished unscented liquid cleaning solution is 40-liters. Ingredient C ‘or unscented liquid cleaning solution Is stored in inventory in 50-liter barrels and allocated in 50-liter increments. Two barrels of Ingredient C are uses to produce a barrel of unscented liquid cleaning solution.
Production sites
• The Eastern United States facility manufactures equipment.
• The Western United States facility manufactures liquid cleaning solutions.
• Raw materials and finished products are stocked at the warehouse and distributed from the warehouse.
Warehouse facilities
The warehouse consists of the following zones:
_ Requirements
Cleaning equipment manufacturing
You identify the following require merits for manufacturing cleaning equipment:
• Production is Make to Stock and must be scheduled at an operational level.
• Machine equipment is produced on an assembly line. Scheduling must be based on production orders.
• Finished products must be packaged and shipped directly from the warehouse.
• To reduce delivery times and excess inventory, equipment must be produced as needed.
• The ability to schedule production must be based on resource capacity and the availability of required materials.
• Production order operations must be scheduled to start only when capacity and materials are available at the same time and in the required quantities.
Liquid cleaning solution manufacturing
• Production is Make lo Order and is scheduled at the job level. Products must be manufactured in batches.
• Finished products must be packaged and shipped directly from the warehouse.
• You must be able to calculate the estimated consumption of ingredients and ensure that the
amount is divisible by the number of units the raw material «s available.
• Formula changes must be reviewed and approved. You must ensure that approved formulas cannot be deleted or edited. Approved formulas may be deactivated.
• An ingredient used to manufacture unscented cleaning solution is defined as a restricted product. You must be able to automatically print a product safety data sheet (PSDS) with the packing slip for any order that includes unscented cleaning solution.
• Production must be scheduled to start by date and time according to the order that is specified by the production route.
• You must implement a scheduled Kanban rule that meets the following requirements:
o Prevent overloading a work cell for scheduled Kanbans. o Visualize excess inventory in a supermarket.
o Store products in supermarkets before they are consumed or shipped.
• You must link relevant financial dimension data to the inventory transactions at each site to ensure that you can trace profit and loss figures directly to East site and West site respectively.
• You must set up production operations for sub-contracting of Pine scent and Orange scent solution to Vendor A to ensure that a purchase order is automatically created based on estimation of a production order.
Costing
• The price of raw materials used for manufacturing unscented cleaning solution must be tracked based upon commodity exchange pricing. The margin and cost multiplier must be set up for commodity traded raw material.
• You must set up cost calculation groups to ensure that indirect costs that originate in the manufacturing of finished goods are recognized and absorbed into the product cost.
• The production manager needs to set up picking list journals and BOM item consumption.
Reporting
• Production control parameters must be setup for reporting of automatic BOM and Route consumption.
• You must create reports that include information about cost records and categories for items, and calculation formulas for indirect costs.
• You must treat manufactured items as purchased items for cost roll-up purposes during BOM calculations and reporting.
• You must configure automatic route consumption in connection with the automatic running of Report as finished.
Inventory control
You must not be required to track the tot number for items when you enter inventory information into the system. Lot numbers for items must be entered when items are picked from inventory.
Issues
Users report the following issues:
• The production manager observes that items are being deducted from inventory two times on production jobs. A shop supervisor mistakenly registers the process for assembling batteries for the pressure washers to Registered as prepared. You must reschedule the process for a future date.
• Customer1 orders 20 barrels of unscented solution. The order is confirmed. Production must be scheduled to start on December 21 to meet the customer’s delivery deadline.
• User2 reports that costs for manufactured items are twice as high as expected.
• User 1 reports that the formula for the liquid cleaning solution sometimes changes during production. You must enforce the policies regarding formula editing for current and future use.
You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area. NOTE: Each correct selection is worth one point.

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing company produces electronic components and devices.
The company has scheduling issues related to using working time calendars in manufacturing.
You need to ensure that the working time calendar is used when manufacturing jobs are scheduled.
Solution: Enable route groups for a capacity job type.
Does the solution meet the goal?
- A . Yes
- B . No
A company uses engineering change management for process manufacturing operations.
The company discovers that several products were configured with missing master data during the life cycle of the products.
You need to configure master data checks for the products.
Which three objects can you configure for data checks? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
- A . standard, non-engineering products
- B . product formulas
- C . product BOM lines
- D . engineering products
- E . product versions
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A client subcontracts production work to a vendor for production operations.
You need to model subcontracting of route operations in production orders.
Solution: Ensure that subcontracting of route operations supports back- ush costing.
Does the solution meet the goal?
- A . Yes
- B . No
DRAG DROP
A company uses separate finished good item numbers for size variations of the same product.
The company wants to minimize the number of variously-sized items that are created.
You need to perform the setup to allow variants in size to the product master.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

A company plans to use master planning in Dynamics 365 Supply Chain Management. The company will sell items between legal entities.
The company has several facilities across legal entities that can manufacture the same products. Same products are produced only in some plants. To meet product demand, when one facility is over capacity, another facility is used to fulfill the downstream demand.
The organizational entities are:
• LegalEntityA: Plant 1.2, and 3
• LegalEntityB: Plant4and 5
• LegalEntityC: Plant 6. 7, and 8
The following plants must be planned together:
• Plant 1. Plant 3. and Plant 4
• Plant 2. Plant 6. and Plant 8
• Plant 5 and Plant 7
You need to configure master planning for the facilities.
Which configuration mechanism should you use?
- A . Production groups
- B . Item model groups
- C . Coverage groups
- D . Intercompany planning groups
HOTSPOT
A company uses Dynamics 365 Supply Chain Management. Technicians travel to several facilities to complete routine maintenance on equipment.
The company recently invested in new equipment. The technicians have no experience maintaining the new equipment.
The technicians must be able to perform the following activities:
• Use apps on their mobile device to complete the maintenance.
• Find links to any visual step-by-step instructions related to the new equipment.
You need to configure features to assist the technicians.
Which features must you configure? To answer, select the appropriate options in the answer area.

A company uses engineering change management in Dynamics 365 Supply Chain Management. The Product readiness checks feature is turned off.
An existing engineering product must be reconfigured for a new product readiness policy.
You need to change the product readiness policy.
Where should you make this change?
- A . default order settings
- B . shared product
- C . engineering category
- D . product configuration model
- E . released product
DRAG DROP
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

DRAG DROP
A company uses Discrete manufacturing concepts to produce cables. The company’s production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identity production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
