Practice Free H19-105_V2.0-ENU Exam Online Questions
What is the name of the controller for opening the sunroof in FM2000?
- A . Sunroof controller
- B . AC actuator.
- C . Access control actuator
- D . ETH socket.
UPS2000-G monitors the entire parallel system with one card. The parallel system only needs one communication option card to monitor the entire parallel system.
- A . True
- B . False
The domestic power supply standard is 380v/50Hz.
- A . True
- B . False
UPS2000-G- (6K-20K) has an output power factor of (), adapting to new IT loads and significantly improving the system’s load capacity.
- A . 0.7
- B . 0.8
- C . 0.9
- D . 0.99
When a fire occurs in Fusionmodule., the controller (ECC800) can control the air conditioner to automatically shut down.
- A . True
- B . False
Which of the following statements about the Fusionmodule2000 cabinet rPDU is wrong?
- A . Available in half-height and full-height
- B . Support C13, C19 and national standard sockets
- C . Smart rPDU supports remote monitoring but not remote shutdown.
A project requires the management system to access a third-party generator set, two smart meters (same model), and two precision air conditioners (same model). The management system needs to report () third-party equipment access fees.
- A . 1
- B . 3
- C . 5
- D . None of the above are correct.
In Fusionmodule2000, the linkage between indoor and outdoor air conditioners can control the fan speed and compressor speed to reduce the power consumption of a single unit.
- A . True
- B . False
What is the maximum IT load and power modules supported by the FusionModule2000 integrated UPS?
- A . 125KW, 5 25KVA power modules
- B . 150KW, 6 25KVA power modules
- C . 125KW, 6 25KVA power modules
- D . 150KW, 7 25KVA power modules
Huawei Configurator can automatically configure the cable specifications and lengths from the front cabinet to the IT cabinet.
- A . True
- B . False