Practice Free C_TS422_2022 Exam Online Questions
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question
- A . Production cost collector
- B . Repetitive manufacturing profile
- C . Routing
- D . Production version
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program.
Which planning strategy do you use?
- A . Make-to-stock production (10)
- B . Planning with final assembly (40)
- C . Make-to-stock production (20)
- D . Planning without final assembly (50)
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question.
- A . Manual maintenance
- B . 100% check
- C . First in First out (FIFO).
- D . Simultaneous
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis.
Which of the following do you have to consider? Note: There are 2 correct answers to this question.
- A . In pro duct-related COC, all costs are debited and credited to a product cost collector.
- B . Order-related COC is beneficial in a flexible production environment
- C . Product-related COC is used in manufacturing for co-products
- D . In order-related COC, individual production orders do NOT have cost segments.
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A . Changing the storage bin in warehouse management
- B . Changing the procurement type in the product master
- C . Changing the operation times in the production data structure
- D . Changing the stock in inventory management
- E . Changing the purchasing contract in materials management
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A . Planning with final assembly (40)
- B . Production by lot size (30)
- C . Planning at assembly level (70)
- D . Make-to-order production (20)
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
- A . Forecast key figures
- B . Safety Stock
- C . Maximum stock level
- D . Purchase orders
where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question.
- A . in the bill of material (BOM)
- B . in the work centers
- C . in the MRP controller
- D . In the routing
- E . in the production version
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A . The planned order is converted to a production order.
- B . The planned order’s component availability is checked.
- C . The planned order generates capacity requirements
- D . The planned order’s components are copied to the picking list.
What do you need to consider when working with material master numbering in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A . Material numbering is defined cross-client.
- B . Material numbering is defined at client level.
- C . The maximum material number length is 18 for external numbers and 18 for internal numbers.
- D . The maximum material number length is 40 for external numbers and 18 for internal numbers