Practice Free C_S43_2022 Exam Online Questions
You need to create a new functional location.
Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question
- A . Edit classification data and characteristics.
- B . Create a task list for functional location
- C . Assign documents
- D . Change a reference location.
- E . Assign a subordinate piece of equipment.
You schedule a Maintenance Service Plan.
Which call object is generated?
- A . Maintenance Order which is linked to a Service Order Header
- B . Customer Service Order with assigned DIP profile
- C . Customer Service Order with an external order operation
- D . Maintenance Order which is linked to a Service Order Item
What do you have to consider when setting up phase-based maintenance?
- A . It is mandatory for breakdown and preventive maintenance.
- B . It is not possible to configure the nine delivered phases.
- C . It can be used with any existing order type.
- D . It comes preconfigured when using the relevant Best Practices scope items.
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents.
What do you need to do? Note: There are 2 correct answers to this question
- A . Assign a measuring point as a production resources/tools (PRT) to a task list operation.
- B . Assign a piece of equipment with an allocated measuring point to a task list operation
- C . Assign an inspection lot to the task list header
- D . Assign an inspection document as a PRT to the task list operation.
You want to have several plan dates calculated in a maintenance plan.
Which scheduling parameter do you use?
- A . Scheduling indicator
- B . Scheduling period
- C . End Date for Scheduling
- D . Call horizon
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months.
Which parameter do you have to use to map this in the system?
- A . Package hierarchy
- B . Scheduling indicator
- C . Maintenance package offset
- D . Cycle modification factor
You require stock material to carry out maintenance tasks.
What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?
- A . Material can be assigned at the order header level.
- B . For stock material you always need a reservation
- C . A goods issue can be entered for planned and unplanned material
- D . The pick list for materials can be printed before order release.
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.
- A . D (Document item)
- B . I (PM Structure element)
- C . F (Functional location)
- D . L (Stock item)
- E . E (Equipment)
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question
- A . Worker Safety applications
- B . SAP Asset Performance Management
- C . SAP Work Manager
- D . SAP Service and Asset Manager (formerly SAP Asset Manager)
How do you map a counter replacement in SAP S/4HANA Asset Management?
- A . Deactivate the current counter and create a new counter.
- B . Create a new measurement document marked as a counter replacement.
- C . Create a new measurement document and assign a valuation code for counter replacement.
- D . Assign a catalogue type for counter replacement to the measuring point category.