Practice Free C_TS422_2022 Exam Online Questions
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A . Finiteness level
- B . Fixed pegging
- C . Scheduling control
- D . Planning mode
- E . Direction
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.
- A . Goods receipt processing time
- B . Move time
- C . Wait time
- D . Float after production
- E . Queue time
You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible.
Which settings do you make to achieve this?
- A . Choose planning strategy 50 (Planning without final assembly) and select the ― corresponding Individual/Collective indicator.
- B . Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.
- C . Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.
- D . Choose planning strategy 20 (Make-to-Order) and select the corresponding ndividual/Collective indicator.
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A . Fill up to the maximum stock level.
- B . Fill up to the safety stock level.
- C . Fill up based on the lot size procedure.
- D . Fill up to the reorder stock level.
which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 Correct answers to this question.
- A . Posting of production costs to the production cost collector
- B . posting of goods receipt for the product
- C . Reduction of associated capacity requirements
- D . Archiving of document for assembly scrap
- E . Material staging for next order in sequence
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A . Move Time
- B . Pick/pack time
- C . Setup time
- D . Float before production
- E . Queue time
which of the following automation options can you use for production orders? Note: There are 2 Correct answers to this question?
- A . you can use mass processing to set production orders to technically complete
- B . you can use the production scheduling profile to automatically set orders toI technically complete
- C . You can use trigger points to automatically create rework orders via confirmation.
- D . You can use mass processing to read PP master data for production orders
which SAP application can be used for forecasting in Supply Chain Planning? Note: there are 2 correct answers to this question.
- A . Integration Business Planning (IBP)
- B . Capacity Requirement Planning (CRP)
- C . Supply Chain Management (SCM)
- D . Material Requirement Planning (MRP)
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.
- A . By capacity planning
- B . By mass processing
- C . By order release
- D . By order confirmation
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A . Installation point
- B . Item type
- C . Quantity
- D . Scrap percentage